Description:
We are looking for two technicians to help on this project on the following days (3/11, 3/12, 4/1, 4/2) Description Pin Pad tech, Remove existing Verifone MX925 devices, install Verifone M450 PIN pads according to provided documentation. ensure all cables are securely connected and functional. maintain cable hygiene: conceal routing, removal of excess slack, elimination of trip hazards and use of approved cable management materials. conduct testing and verification of installed devices: Perform
Feb 12, 2026;
from:
dice.com